GRAVATÁ WIND FARM – 14,85 MW
Assembly of Switchyard 13.8 / 69 kV - 20 MVA and MPCC system, assembly nine switchyard 690 / 13 800 kV - 1,700 kVA; installation of medium voltage underground network at 13.8 kV, consisting of 11.2 km cables, underground optical network, a total of 4.15 km of cables, and low-voltage network, linking the wind tower too the system.