Substations
GERAMAR I AND II OIL POWER PLANT - 330 MW
The underground infrastructure for thirty eight electric generators; oily drainage, underground hydro-sanitary and fire fighting system.
CASA DE SAÚDE SANTA EFIGÊNIA/ PLÁS-ALCO/ TV JORNAL DO COMMÉRCIO / INDÚSTRIA DE BEBIDAS IGARASSÚ-IBI/ FRALDAS SAPEKA / IPEM/AMANCO / OLINDA SHOPPING/ M&G POLÍMEROS /WESTON/ NORCLÍNICAS/ ECONÔMICO / BOMPREÇO/ INDÚSTRIAS RENDA /IT / TER / HOSPITAL CAMARAGIBE / DECAL / BANCO DO BRASIL
Design and construction of a 13.800/380/220/110 V reduction substation, with a total power installed of 15.525 kVA.
UTE (Thermoeletrical Plant) PIRAPAMA BIOENERGY
Construction of the elevator Substation with 13,8 / 69 kV - 26,6 MVA capacity and MPCC system .